Air Law · Chapter 16
Aeronautical Information Service
Where a pilot finds out what has changed: the AIP, NOTAM, AIC, the AIRAC calendar, SNOWTAM and ASHTAM.
© 2026 eatpl.in. For the personal study of eatpl.in students only. Do not copy or distribute.
e-books by eatpl.in · © 2026 · Do not copy or distribute
Annex 15
Who provides the information
- Each state provides an aeronautical information service (Annex 15), or delegates it
- In India: the Airports Authority of India runs AIS and publishes the AIP India
- Available 24 hours, or while aircraft are flying in its area plus 2 hours before and after
- Information must be accurate, timely and in a standard form, with quality management
- Uses UTC, the Gregorian calendar and WGS-84 coordinates
Chapter 16 · Aeronautical Information Service
2
e-books by eatpl.in · © 2026 · Do not copy or distribute
The integrated aeronautical information package
Seven parts that work together
AIP: three parts
GEN: rules, codes, services, charges. ENR: rules en route, airspace, routes, navaids, warnings. AD: aerodromes and heliports.
Supplements
For temporary changes lasting 3 months or more, or shorter ones with a lot of text or graphics. Checklist at least monthly.
PIB
Pre-flight information bulletin: the current NOTAM and other information relevant to your route.
Chapter 16 · Aeronautical Information Service
3
e-books by eatpl.in · © 2026 · Do not copy or distribute
AIRAC
Changes on a shared calendar
Common dates
Operationally significant changes take effect only on AIRAC dates, every 28 days, the same worldwide.
Notice
Sent out at least 42 days before the effective date; 56 days for major changes.
Stability
No further change for at least 28 days after it takes effect, unless temporary. A NOTAM announces each AIRAC amendment.
Chapter 16 · Aeronautical Information Service
4
e-books by eatpl.in · © 2026 · Do not copy or distribute
What
Urgent, temporary or short-notice information sent by telecommunication: openings, closures, changes, hazards.
When
Issued promptly; at least 24 hours notice desirable. Long-lasting temporary changes go in a supplement instead.
Not for
Routine maintenance, partial lighting failures, or anything of no operational importance.
Checklist
A checklist of NOTAM in force at least monthly, plus a monthly plain-language summary.
Trigger NOTAM
Points to an AIRAC amendment or supplement so it shows up in pre-flight bulletins.
Distribution
To those who would otherwise get less than 7 days notice, via the AFS.
Chapter 16 · Aeronautical Information Service
5
e-books by eatpl.in · © 2026 · Do not copy or distribute
Special NOTAM
Snow and volcanic ash
- SNOWTAM: snow, ice, slush or standing water on the movement area, in a set format; runway condition now reported with a runway condition code
- ASHTAM: volcanic activity and ash that matters to aircraft, valid for at most 24 hours
- ASHTAM colour code: green, yellow, orange, red
- Volcanic ash can stop engines; plan around it and report any encounter
- Reports of ash also reach pilots as SIGMET
Chapter 16 · Aeronautical Information Service
6
e-books by eatpl.in · © 2026 · Do not copy or distribute
AIC and briefing
Circulars, bulletins and reports back
AIC
Information that fits neither the AIP nor a NOTAM: long-term forecasts of change, explanations, advice, administrative matters.
AIC form
Printed, numbered in sequence each year; a checklist issued at least yearly.
Pre-flight
Aerodromes provide briefing, with the AIP, NOTAM, PIB and charts, for pilots before departure.
Post-flight
Pilots report problems found with aerodrome facilities, navigation aids or birds, for AIS to pass on.
India
AIP India, AIP Supplements, NOTAM and AIC are issued by the AAI and are available online as the eAIP.
Charts
Charts follow Annex 4: en-route, area, SID, STAR, approach, aerodrome charts.
Chapter 16 · Aeronautical Information Service
7
e-books by eatpl.in · © 2026 · Do not copy or distribute
Summary
What to take into the exam
Package
AIP, amendments, supplements, NOTAM, PIB, AIC, checklists.
AIP
GEN, ENR, AD. In India by AAI.
AIRAC
28-day cycle; send 42 days ahead (56 for major); stable 28 days.
Supplements
Temporary changes of 3 months or more; checklist monthly.
NOTAM
Urgent or short-term; checklist monthly; trigger NOTAM for AIRAC changes.
ASHTAM
Max 24 h. Green, yellow, orange, red.
Chapter 16 · Aeronautical Information Service
8
e-books by eatpl.in · © 2026 · Do not copy or distribute