Air Law · Chapter 15
Control of Aircraft How controllers actually run the sky: radar identification and vectors, radar approaches, the tower’s runway, approach control and what to do in an emergency.
© 2026 eatpl.in. For the personal study of eatpl.in students only. Do not copy or distribute.
e-books by eatpl.in · © 2026 · Do not copy or distribute
Chapter fifteen looks at how controllers actually control aircraft. We cover procedural and radar control, how an aircraft is identified on radar, radar vectoring and radar approaches, how the tower runs the runway, what approach control does with departures, arrivals, holding and expected approach times, the advisory service, and a few emergency procedures.
Chapter roadmap
What this chapter covers 01
Radar Identification, service, vectoring, PAR and SRA.
02
Tower and approach Runway use, information to pilots, approach clearances, sequencing, EAT.
03
Advisory and emergencies Class F advisory service, emergency descent, fuel jettison.
Chapter 15 · Control of Aircraft
2
e-books by eatpl.in · © 2026 · Do not copy or distribute
Three parts. First, radar: identification, the service, vectoring, and precision and surveillance radar approaches. Second, the tower and approach control: the runway, information passed to pilots, approach clearances, sequencing and expected approach times. Third, the advisory service and some emergencies.
Radar
First, the controller must know which blip is you No radar service until the aircraft is identified Methods: a discrete SSR code , IDENT , a position report over a known point, a turn of 30° or more , or a handover The controller says “radar contact ” and where; if it does not match your position, say so You are told the type of service and its aim, and when it ends (“resume own navigation”) Keep your assigned code; if already identified, do not switch to 7700 in an emergency unless asked IGO123 A4521 · 120 AIC456 IDENT VTEAT turned 30° SSR code a discrete code is seen IDENT the pilot presses IDENT Turn a turn of 30° or more Position a report over a known point Handover passed on by a colleague
Chapter 15 · Control of Aircraft
3
e-books by eatpl.in · © 2026 · Do not copy or distribute
Before a controller can give a radar service, the aircraft must be identified. The quickest way is a discrete SSR code; others are the IDENT feature, a position report over a known point, asking the aircraft to turn thirty degrees or more and watching which blip turns, or a handover from another radar controller. The controller then says radar contact and where you are; if that does not match where you think you are, say so at once. You are told what type of service you are getting and its purpose, and when it ends you are told to resume your own navigation. Keep the code you were given; if you are already identified on a discrete code, do not change to seventy-seven hundred in an emergency unless asked, because that can slow help down.
Vectors are magnetic headings ; the controller allows for wind, so you fly the heading Only inside the radar vectoring area , at least 2.5 NM (or half the radar minimum) from its edge No descent below the area’s safe altitude until established on the localiser or final track, or visual Closing heading to the localiser at most 45° (30° for parallel approaches) Accept vectors on departure only if clear of obstacles with an engine failed Fly the heading: the controller allows for wind Radar vectoring area 2.5 NM inside its edge Not below its safe altitude until established on the localiser ≤ 45° (30° for parallels)
Chapter 15 · Control of Aircraft
4
e-books by eatpl.in · © 2026 · Do not copy or distribute
Radar vectoring means the controller gives you magnetic headings to fly, and allows for the wind, so you simply fly the heading. Vectoring is only done inside the radar vectoring area, keeping at least two and a half nautical miles, or half the radar minimum, from its edge. You will not be cleared below the area’s safe altitude, the highest obstacle plus clearance, until you are established on the localiser or final approach track, or report continuing visually. To join a localiser, the closing heading is at most forty-five degrees, or thirty degrees for parallel approaches. And remember from departures: accept vectors only when you are high enough to clear obstacles with an engine failed.
Radar approaches
PAR and SRA PAR: on, above or below the glide path, to the decision height SRA: headings and advisory heights 1 NM · 350 ft 2 NM · 650 ft 3 NM · 950 ft 4 NM · 1250 ft 5 NM · 1550 ft ends at the termination range, often 2 NMPAR Precision : a dedicated controller gives direction and glide path (“on”, “above”, “below”) all the way to the DH . Landing clearance by 2 NM , or go around.
SRA Non-precision with an MDA/H: direction plus advisory heights every mile (every half mile for RTR 1). Ends at the radar termination range .
Lost contact If radar contact is lost for a significant time in the last 2 NM , fly the missed approach.
Chapter 15 · Control of Aircraft
5
e-books by eatpl.in · © 2026 · Do not copy or distribute
Radar can also guide you all the way down. A precision approach radar, PAR, uses a dedicated controller who talks you down in both direction and glide path, saying on, above or below, until you reach your decision height. Because you stay on the radar frequency, the controller gets your landing clearance, normally at four miles; if none has come by two miles, you go around. A surveillance radar approach, SRA, is non-precision with a minimum descent height: the controller gives headings and advisory heights, for example that at five miles you ought to be at about fifteen fifty feet, once a mile, or every half mile when the radar termination range is one mile. The service ends at the radar termination range, often two miles. And if the radar loses you for more than a moment in the last two miles, you fly the missed approach.
02
Tower and approach Who owns the runway, and who sequences the arrivals.
e-books by eatpl.in · © 2026 · Do not copy or distribute
Part two: the tower and approach control, who owns the runway and who sequences the arrivals.
The tower and the runway
One aircraft on the runway at a time take-off roll line up and wait its own clearance: once the one ahead is past the far end or turned away landing clearance about 4 miles out, no later than 2 vacated: wholly past the holding pointDepartures “Line up and wait” as soon as the one ahead starts rolling; take-off clearance once it has crossed the far end or turned away .
Arrivals Landing clearance normally about 4 NM out, no later than 2 NM . Report “vacated” only when the whole aircraft is past the holding point.
Land after By day only, dry runway, the following pilot sees the leader throughout and keeps own separation; the tower sees the whole runway.
Chapter 15 · Control of Aircraft
7
e-books by eatpl.in · © 2026 · Do not copy or distribute
The aerodrome controller’s main job is the runway, normally one aircraft on it at a time. The runway in use is usually the one most into wind, though in light winds another may be chosen for noise or traffic. A departing aircraft may be told to line up and wait once the one ahead starts its take-off roll, but its own take-off clearance waits until that aircraft has crossed the far end of the runway or turned away. An arriving aircraft normally gets its landing clearance about four miles out and no later than two; after landing, the pilot reports runway vacated only when the whole aircraft is past the holding point. To fit more landings in, the tower may give a land after clearance: only by day, on a dry runway, with the following pilot seeing the leader all the way and keeping their own separation, and with the tower able to see the whole runway.
Tower and approach
What you are told, and when RWY WIND QNH TEMP VIS TIME before taxi Before taxi Runway, surface wind, QNH , temperature (for turbines), visibility or RVR, time.
changes + climb-out weather Before take-off Significant changes in wind, temperature, visibility, and weather in the climb-out area.
runway · wind · QNH · surface Joining or approaching Runway, surface wind, QNH; then runway conditions and changes to aids.
head 10 kt tail 2 kt cross 5 kt Starting final Significant wind changes (head 10 kt, tail 2 kt, cross 5 kt), wind shear, visibility or RVR.
N E S W wind 270°M runway 27 same reference Wind in degrees magnetic So you can compare it directly with the compass and runway.
rescue and fire-fighting alerted · circuits stopped Emergency on the field The tower alerts rescue and fire-fighting , and may stop circuit flying.
Chapter 15 · Control of Aircraft
8
e-books by eatpl.in · © 2026 · Do not copy or distribute
Pilots are given information at each stage. Before taxi: the runway in use, the surface wind, the QNH, the temperature for turbine aircraft, the visibility or RVR, and the time. Before take-off: any significant changes, and significant weather in the climb-out area. Before joining the circuit or starting an approach: the runway, surface wind and QNH, then runway surface conditions and any changes to visual or radio aids. At the start of final approach: significant wind changes, such as a ten knot change in headwind, two knots of tailwind or five knots of crosswind, any wind shear or turbulence, and the visibility or RVR. Wind is given in degrees magnetic so you can compare it with your compass and the runway. And in an emergency on the aerodrome, the tower alerts rescue and fire-fighting and may suspend circuit flying.
Approach
Departures, arrivals, sequencing and EAT turn track level downwind take-off? PIC decides Departure clearance Take-off direction and turn, track, level to hold, when to change level. A downwind take-off may be offered; the PIC decides .
min alt fix only after the fix, or in sight Below minimum altitude Only after passing a fix, with the aerodrome in sight, on a visual approach, or when radar has fixed the position.
Visual approach An IFR flight may be cleared if the pilot sees the ground and the ceiling is at or above the initial approach level.
230 220 210 200 190 210 kt from IAF ±20 kt, steps of 10 none inside 4 NM Speed control Usually 210 kt from the IAF; changes up to 20 kt, multiples of 10; none inside 4 NM .
FL60 FL70 FL80 first to arrive: lowest Sequence Least average delay; priority to aircraft forced to land and to medical flights. First to arrive holds lowest.
EAT revised at 5 min · always if 30+ EAT Given if holding is expected, preferably before descent; revised when it changes by 5 min or more; always if the hold is 30 min or more.
Chapter 15 · Control of Aircraft
9
e-books by eatpl.in · © 2026 · Do not copy or distribute
Approach control handles departures and arrivals around the aerodrome. A departure clearance gives the take-off direction and turn, the track, the level to hold and when to change it; ATC may offer a downwind take-off to save time, but the pilot-in-command decides. An IFR flight is cleared below the minimum altitude for an initial approach only once it has passed a suitable fix, reports the aerodrome in sight, is making a visual approach, or radar has fixed its position. A visual approach may be cleared when the pilot can see the ground and the ceiling is at or above the initial approach level. Speed control is typically two hundred and ten knots from the initial approach fix, with changes of no more than twenty knots in multiples of ten, and none inside four miles. The approach sequence aims for the least average delay, with priority for aircraft that may have to land urgently and for medical flights, and the first to arrive normally holds lowest. And if delay is expected, you get an expected approach time, preferably before you start descent, revised whenever it changes by five minutes or more, and always if you are expected to hold for thirty minutes or more.
03
Advisory and emergencies When ATC can only advise, and when things go wrong.
e-books by eatpl.in · © 2026 · Do not copy or distribute
Part three: the advisory service, and when things go wrong.
Class F and emergencies
Advice only, and some emergencies we advise… advice, not clearance class F · file a flight plan Advisory service Class F: separation of participating IFR as far as practical. Advice , not clearances; file a flight plan.
advisory route at 90° semicircular level Crossing an advisory route At right angles , at a level following the semicircular rule.
ATC warns traffic; crew calls its level Emergency descent ATC broadcasts a warning; the crew broadcasts its level as it descends.
over water ≥ 6000 ft away from towns Fuel jettison Tell ATC; away from towns, preferably over water, clear of storms, not below 6000 ft .
4521 7700 already identified: keep it Already identified? Keep your discrete code rather than switching to 7700.
AIC456 FL120 IGO123 FL100 VTEAT FL060 Strips Procedural control still tracks each flight on a flight progress strip .
Chapter 15 · Control of Aircraft
11
e-books by eatpl.in · © 2026 · Do not copy or distribute
In class F airspace the advisory service separates participating IFR flights as far as practical. Controllers give advice, not clearances, and IFR flights in class F file flight plans. Cross an advisory route at right angles, at a level that follows the semicircular rule. In an emergency descent, ATC broadcasts a warning to other traffic, and the crew broadcasts its level as it comes down. Before jettisoning fuel, tell ATC; do it away from towns, preferably over water and clear of thunderstorms, and no lower than six thousand feet, so the fuel evaporates before reaching the ground. If you are already identified on a discrete code, keep it rather than switching to seventy-seven hundred. And behind all of this, procedural control still tracks each flight on a flight progress strip.
Summary
What to take into the exam Identification SSR code, IDENT, position report, 30° turn, handover. “Radar contact” plus position.
Vectoring Fly the heading. 2.5 NM from the RVA edge. Join the localiser at ≤ 45° (30° parallels).
PAR and SRA PAR to DH; SRA advisory heights to RTR (often 2 NM). Lost contact in last 2 NM: go around.
whole aircraft past the line Runway Landing clearance by 2 NM at the latest. Vacated = whole aircraft past the holding point.
230 220 210 200 190 210 kt from IAF ±20 kt, steps of 10 none inside 4 NM Approach 210 kt from IAF; no speed control inside 4 NM. EAT revised for 5 min changes.
over water ≥ 6000 ft away from towns Jettison Above 6000 ft, away from towns, ideally over water.
Chapter 15 · Control of Aircraft
12
e-books by eatpl.in · © 2026 · Do not copy or distribute
Six things to take into the exam. Identification is by SSR code, IDENT, a position report, a turn of thirty degrees or a handover, confirmed with radar contact and your position. Under vectors, fly the heading; vectoring stays two and a half miles inside the area’s edge; join the localiser at forty-five degrees or less, thirty for parallels. A PAR guides you to the decision height, an SRA gives advisory heights to the termination range, and lost contact in the last two miles means going around. Landing clearance comes by two miles at the latest, and vacated means the whole aircraft is past the holding point. Approach speed control starts around two hundred and ten knots and stops inside four miles, and an expected approach time is revised for changes of five minutes. And jettison fuel above six thousand feet, away from towns, ideally over water.