Electrics · Chapter 12
Paralleling, Load Sharing and Protection Frequency-wild and constant-frequency generation, the rules for running AC generators in parallel, real and reactive load sharing, and the units that protect and control the system.
three generators · one frequency · one phase sequence SYNCHRONISING BUS BTB LOAD BUS 1 GCB GEN 1 BTB LOAD BUS 2 GCB GEN 2 BTB LOAD BUS 3 GCB GEN 3 © 2026 eatpl.in. For the personal study of eatpl.in students only. Do not copy or distribute.
e-books by eatpl.in · © 2026 · Do not copy or distribute
Chapter twelve is about how several AC generators work together. We start with the choice between frequency-wild and constant-frequency generation, and why only constant-frequency machines can ever be run in parallel. Then we look at what must match before two generators are connected, how the load is shared between them, both the real load in kilowatts and the reactive load, and finally at the breakers, control units and protection circuits that keep a fault on one generator or bus from taking down the rest. These are some of the most examined topics in A C electrics.
Road map
Making AC generators work as a team Wild or constant? Paralleling Load sharing Protection Wild or constant How the generator is driven decides its frequency, and whether it can ever be paralleled.
Paralleling Voltage, frequency, phase and phase sequence must all match: the synchronising unit checks.
Load sharing Real load (kW) by drive torque; reactive load (kVAR) by excitation.
Protection GCB, BTB, GCR, differential protection, discrimination, GCU and BPCU; emergency sources.
Chapter 12 · Paralleling, Load Sharing and Protection
2
e-books by eatpl.in · © 2026 · Do not copy or distribute
Here is our road map for this chapter. First, we ask how a generator is driven, because that decides whether its frequency is wild or constant, and only constant-frequency generators can ever be connected in parallel. Second, we look at paralleling itself: the four things that must match before two generators are joined, and how a synchronising unit checks them. Third comes load sharing, the heart of the chapter. Real load, in kilowatts, is shared by adjusting the torque from each drive, and reactive load is shared by adjusting each generator's excitation. Finally we cover protection and control: the breakers, the generator control unit, differential protection and the logic that isolates only the faulty part, and the emergency and ground sources of A C power.
Part 1 · Wild or constant
The constant-frequency standard Large aircraft distribute AC : more power for less cable weight Industry standard: 115 V / 200 V, 400 Hz, three-phase 28 V DC comes from transformer rectifier units (TRUs); the battery is kept for emergenciesBus bars form a hierarchy , so a failure loses as few services as possible Generators run either in parallel or isolated (split bus), as the designer chooses Engine gearbox CSD constant speed Generator 3-phase variable speed in → constant speed out AC bus bars: 115 V / 200 V · 400 Hz · 3-phase AC loads motors, lights, heaters TRU AC → 28 V DC 28 V DC bus bars Battery kept for emergency
Chapter 12 · Paralleling, Load Sharing and Protection
3
e-books by eatpl.in · © 2026 · Do not copy or distribute
As aircraft grew, their electrical loads grew too, and most large transport aircraft now generate and distribute alternating current. The industry standard for constant-frequency aircraft is one hundred and fifteen volts phase, two hundred volts line, at four hundred hertz, three-phase. The aircraft still needs twenty-eight volts D C for many systems, and that comes from transformer rectifier units, or T R Us, fed from the A C buses. The battery stays, mainly for emergencies and for starting the A P U. Just as in a D C aircraft, the bus bars are arranged in a hierarchy, so that any single failure loses the fewest possible services. And, as with D C generators, the designer may choose to run the A C generators in parallel, or to keep each one on its own buses. That choice is what this chapter is about.
Part 1 · Wild or constant
Frequency-wild generation Generator driven straight from the engine gearbox : no constant speed drive Frequency follows engine speed: f = poles × rpm ÷ 120 Example: 4 poles at 12 000 rpm = 400 Hz ; at 60% speed only 240 Hz Voltage can still be regulated ; it is the frequency that is wild Two wild generators can never be paralleled : their frequencies never match 50 60 70 80 90 100 150 200 250 300 350 400 450 Engine speed (% of maximum) Output frequency (Hz) constant frequency: 400 Hz ± 5% frequency wild: follows the engine 240 Hz f = (poles × rpm) ÷ 120: 4 poles × 12 000 rpm ÷ 120 = 400 Hz
Chapter 12 · Paralleling, Load Sharing and Protection
4
e-books by eatpl.in · © 2026 · Do not copy or distribute
Frequency wild is what you get when the generator is driven straight from the engine gearbox, with no constant speed drive. The output frequency equals the number of poles times the revolutions per minute, divided by one hundred and twenty. So a four-pole generator turning at twelve thousand r p m gives four hundred hertz. Watch the scene: as the engine accelerates, the generator speeds up and the frequency climbs with it; when the engine is throttled back to reduce speed, the frequency falls again. At sixty per cent speed the same machine gives only two hundred and forty hertz. A voltage regulator can still hold the voltage steady, so it is only the frequency that is wild. And because two engines never run at exactly the same speed, two frequency-wild generators can never be connected in parallel.
Part 1 · Wild or constant
What wild AC is good for Resistive heaters do not care about frequency: propeller, engine and airframe de-icing , windscreen heatNot for motors, transformers or instruments: XL = 2πfL and motor speed both change with fConstant frequency from wild AC: rectify to DC , then a static inverter makes 400 Hz Wild generators can never be paralleled, but their rectified DC can share a common DC bus for redundancy Modern variant: VSCF , wild generator plus an electronic converter (see chapter 11) 200 250 300 350 400 450 0 10 20 30 Supply frequency (Hz) Opposition to current (Ω) heater mat: R = 20 Ω at any frequency coil: X L = 2π f L (10 mH) 15.1 Ω 25.1 Ω At 115 V the coil draws 7.6 A at 240 Hz but 4.6 A at 400 Hz: motors and transformers need a steady frequency; heaters do not.
Chapter 12 · Paralleling, Load Sharing and Protection
5
e-books by eatpl.in · © 2026 · Do not copy or distribute
What can you do with A C whose frequency wanders? Anything that is purely resistive does not mind, because a heater mat has the same resistance at any frequency. That is why frequency-wild generators are typically used for electrical de-icing of propellers, engine intakes and airframe parts, and for windscreen heating. Inductive loads are a different story. The reactance of a coil rises with frequency: on the graph, a ten millihenry coil offers about fifteen ohms at two hundred and forty hertz but twenty-five ohms at four hundred, so its current changes by two thirds. Motor speeds change with frequency too. If an aircraft with only wild generators needs constant-frequency A C, the wild supply is rectified to D C and a static inverter turns it back into four hundred hertz. The generators themselves can never be paralleled, but after rectification their D C outputs can feed a common D C bus, which gives redundancy.
Part 1 · Wild or constant
Frequency wild, split bus or parallel? Frequency wild Constant frequency: split bus Constant frequency: parallel Drive Direct from engine gearbox CSD or IDG (or VSCF converter) CSD or IDG on every generator Frequency Follows engine speed 400 Hz ± 5% (380–420 Hz) 400 Hz, all locked together Paralleled? Never No : BTB normally openYes : BTBs normally closedExtra equipment Inverter if CF AC is needed Auto bus transfer on failure Synchronising, real and reactive load sharing, discrimination Typical use De-icing, heaters (turboprops) Most modern twin jets Three- and four-engine aircraft Cooling Ram air in flight, fan on ground IDG: own oil, oil cooler IDG: own oil; separate CSD: air and/or oil
Being constant frequency makes paralleling possible , not compulsory: frequency-controlled generators are not always paralleled.
Chapter 12 · Paralleling, Load Sharing and Protection
6
e-books by eatpl.in · © 2026 · Do not copy or distribute
Let us compare the three arrangements side by side. Frequency-wild generators are driven straight from the gearbox, their frequency follows the engine, and they are never paralleled. Constant-frequency generators have a constant speed drive, or an integrated drive generator, holding them within five per cent of four hundred hertz, that is between three hundred and eighty and four hundred and twenty hertz. Most modern twin jets keep their constant-frequency generators apart in a split bus system, with the bus tie breaker normally open. Three- and four-engine aircraft often run them in parallel, with the bus tie breakers normally closed, and that needs synchronising, load sharing and discrimination circuits. Notice the cooling row too: generators with a separate drive are cooled by ram air in flight, with a fan on the ground, while an I D G cools its stator with its own oil. Exam point: being constant frequency makes paralleling possible, not compulsory.
Part 2 · Paralleling
Why parallel, and why not? No-break power If one generator fails, the others are already on the bus: its loads carry on without a break .
Big shared capacity The combined machines absorb heavy transient loads when big consumers are switched.
Even loading Every generator carries a fair share , so none is overworked.
Complexity Needs CSDs on every generator, load sharing circuits , synchronising units and discrimination.
Faults can spread A bus or generator fault is fed by all the generators until protection isolates it.
Modern choice Most twin jets run split ; three- and four-engine types often run parallel .
Chapter 12 · Paralleling, Load Sharing and Protection
7
e-books by eatpl.in · © 2026 · Do not copy or distribute
Why go to the trouble of paralleling at all? There are real advantages. If a generator fails, the others are already connected to the same bus, so its loads carry on without even a flicker. The combined capacity of several machines can absorb heavy transient loads, for example when large consumers are switched in. And every generator carries a fair share of the work. The price is complexity. Every generator needs a constant speed drive, and you need load sharing circuits for real and reactive load, synchronising units, and discrimination circuits so that a fault takes out only the faulty part. Without that protection, a fault on one bus would be fed by every generator at once. That is why most modern twin-engine aircraft keep their two generators isolated in a split bus system, while three- and four-engine aircraft have often used paralleled systems.
Part 2 · Paralleling
Four things must match before paralleling 1 · Voltage equal amplitude If not: lower voltage: reactive current flows 2 · Frequency equal number of cycles If not: faster: drives fight each other 3 · Phase peaks line up together If not: out of phase: heavy current surge 4 · Phase sequence A-B-C on both A B C A C B running incoming rotation anticlockwise If not: reversed sequence: never connect Same voltage , same frequency , in phase , same phase sequence — and a working means of real and reactive load sharing must be available.
Chapter 12 · Paralleling, Load Sharing and Protection
8
e-books by eatpl.in · © 2026 · Do not copy or distribute
Before an incoming generator may be connected to a bus that another generator is already feeding, four things must match. First, the voltage: if one is lower, a reactive current flows from the higher to the lower. Second, the frequency: alternators are synchronous machines, and once joined they lock together at one frequency, so if they start at different speeds one is violently slowed while the other is pulled faster, putting big shocks into both drives. Third, the phase: the peaks must line up at the moment of connection. Fourth, the phase sequence: phases A, B and C must follow in the same order on both machines. And there is one more requirement that examiners love: a working means of automatic real and reactive load sharing must be available, otherwise the generators will not share the load once they are joined.
Part 2 · Paralleling
Why a mismatch is dangerous Any difference between the two voltages drives a circulating current from one generator into the other The only thing limiting it is the generators' very low internal impedance Worked example: 20° phase error gives ≈ 40 V difference and ≈ 400 A That is more than full-load current of a 90 kVA generator (≈ 261 A per phase) Matching, then sharing load evenly, both exist to prevent large current flows between generators Closing 20° out of phase 20° running gen 115 V incoming gen 115 V 40 V Difference = 2 × 115 × sin 10° ≈ 40 V Total impedance of both machines ≈ 0.1 Ω Circulating current ≈ 40 ÷ 0.1 ≈ 400 A (full-load current of a 90 kVA generator ≈ 261 A)
Chapter 12 · Paralleling, Load Sharing and Protection
9
e-books by eatpl.in · © 2026 · Do not copy or distribute
Why does the matching matter so much? Picture two generators, each giving one hundred and fifteen volts, but twenty degrees out of phase at the moment the breaker closes. The difference between their voltages is the short red phasor between the two tips: two times one hundred and fifteen times the sine of ten degrees, or about forty volts. That voltage has nothing to push against except the internal impedance of the two machines and their cables, perhaps a tenth of an ohm. So roughly four hundred amps circulate from one generator to the other, more than the full-load current of a ninety K V A generator, which is about two hundred and sixty amps per phase. None of that current does useful work. It heats the windings and slams torque into the drives. Preventing these circulating currents is exactly why generators are synchronised before connection, and why their real and reactive loads are shared once they are joined.
Part 2 · Paralleling
The synchronising unit Checks voltage, frequency and phase sequence (and phase) of the incoming generator Automatic : will not let the BTB or GCB close until all are within limits; built into the GCU or bus protection unitManual dark-lamp method (older aircraft): lamps across the open breaker contactsLamps bright = voltage difference; all lamps dark = in step Close the breaker in the middle of a dark period Dark-lamp method running bus incoming gen A B C All three lamps dark = no voltage across the breaker = same voltage, frequency and phase: CLOSE
Chapter 12 · Paralleling, Load Sharing and Protection
10
e-books by eatpl.in · © 2026 · Do not copy or distribute
The synchronising unit makes sure the incoming generator matches before it is allowed onto a common bus. On modern aircraft this is automatic: circuitry in the generator control unit or the bus protection unit simply will not let the bus tie breaker or generator breaker close until voltage, frequency and phase sequence are all within very tight limits. Older aircraft used the manual dark-lamp method. Look at the scene. The running bus is live at the top, and the incoming generator is below, with its breaker open. A lamp is connected across the open contacts in each phase. While the two supplies differ, there is a voltage across each lamp, so the lamps glow and fade as the generators slip in and out of step. When the supplies line up, all the lamps go dark, because there is no voltage across them. That is the moment to close the breaker.
Part 2 · Paralleling
Reading the lamps: slip frequency 0 0.25 0.5 0.75 1 0 115 230 Time (seconds) · bus 400 Hz, incoming generator 402 Hz: slip 2 Hz Lamp voltage (V) dark: in phase, close the breaker here bright: 180° apart bright again The lamps flicker at the difference between the two frequencies. Slow flicker = nearly matched. All dark = in phase: close.
Chapter 12 · Paralleling, Load Sharing and Protection
11
e-books by eatpl.in · © 2026 · Do not copy or distribute
How fast do the lamps flicker? At the difference between the two frequencies, called the slip frequency. In this example the bus runs at four hundred hertz and the incoming generator at four hundred and two, a slip of two hertz. The phase difference between them creeps round through a full circle twice every second. When they are a hundred and eighty degrees apart, the lamp sees the full difference of two times one hundred and fifteen, about two hundred and thirty volts, and glows brightly. When they come back into phase, the voltage falls to zero and the lamp goes dark. So the lamps brighten and darken twice a second. The operator adjusts the incoming machine until the flicker is slow, then closes the breaker in the middle of a dark period. Fast flicker means the frequencies are still far apart.
Part 2 · Paralleling
Layout of a paralleled system SYNCHRONISING (TIE) BUS no loads of its own BTB 1 LOAD BUS 1 loads loads GCB 1 GEN 1 (CSD-driven) BTB 2 LOAD BUS 2 loads loads GCB 2 GEN 2 (CSD-driven) BTB 3 LOAD BUS 3 loads loads GCB 3 GEN 3 (CSD-driven) APU or ground power only when the GCBs are open
Chapter 12 · Paralleling, Load Sharing and Protection
12
e-books by eatpl.in · © 2026 · Do not copy or distribute
Here is the layout of a typical three-generator paralleled system. Each generator connects to its own load bus through its generator breaker, the G C B, a three-phase breaker worked automatically or from the flight deck. Each load bus is really three bars, one for each phase, and the aircraft's loads are spread across the three load buses. Each load bus then connects through a bus tie breaker, or B T B, to the synchronising bus, sometimes called the tie bus. The synchronising bus carries no loads of its own; it exists only so that the generators can be connected in parallel. With all the tie breakers closed, all the generators are in parallel. On the ground, the A P U generator or ground power can be connected to the synchronising bus, and from there feed the load buses through the B T Bs, but only while the generator breakers are open.
Part 3 · Load sharing
Real load and reactive load Real load : power that does work, in kilowatts (kW) ; comes from the drive torque Reactive load : the "wattless" load that builds magnetic and electric fields, in kVAR Together they make the apparent power in kVA , which sets the current and the heating That is why alternators are rated in kVA , not kW Paralleled generators must share both real and reactive load Power triangle: 90 kVA at PF 0.8 φ ≈ 37° Real power 72 kW does the work · set by drive torque 54 kVAR reactive set by excitation 90 kVA apparent kW = kVA × PF = 90 × 0.8 = 72 kVAR = √(90² − 72²) = 54
Chapter 12 · Paralleling, Load Sharing and Protection
13
e-books by eatpl.in · © 2026 · Do not copy or distribute
To share load properly we must split it into two parts. Real load is the power that does useful work, heating, turning motors and so on. It is measured in kilowatts, and it comes ultimately from the mechanical torque fed into the generator by its drive. Reactive load is the so-called wattless load: current that flows back and forth to build the magnetic fields of motors and transformers, and the electric fields of capacitors. It is measured in kilovolt-amps reactive, K V A R. Together they make the apparent power in K V A. Take a ninety K V A generator at a power factor of nought point eight: it supplies seventy-two kilowatts of real power and fifty-four K V A R of reactive power. The current, and so the heating of the windings, depends on the K V A, which is why alternators are rated in K V A. Paralleled generators must share both parts evenly.
Part 3 · Load sharing
Real load sharing: drive torque In parallel, all generators are locked to the same frequency A generator takes more kW only if its drive gives more torque The load controller trims each CSD governor (swash plate) Higher-loaded drive: less torque ; lower-loaded drive: more torque Real load sharing = speed / frequency / torque control of the CSD Real load sharing: 90 kW total 0 15 30 45 60 Real load (kW) 55 kW Gen 1 35 kW Gen 2 45 kW Gen 1 45 kW Gen 2 before after Drive 1 torque down, drive 2 torque up
Chapter 12 · Paralleling, Load Sharing and Protection
14
e-books by eatpl.in · © 2026 · Do not copy or distribute
Real load sharing is done by the drives. Once generators are in parallel they are locked together, turning at exactly the same speed, so a drive cannot simply run faster than the others. What it can do is push harder. If one constant speed drive delivers more torque, its generator rotor edges ahead in phase and takes a bigger share of the real load. In the scene, generator one starts with fifty-five kilowatts and generator two with only thirty-five. Watch the meters as the load controllers adjust the torque: drive one is told to reduce its torque and drive two to increase, until both carry forty-five kilowatts. The load controller sets the basic four hundred hertz of each drive and, once paralleled, trims the speed governor, which moves the swash plate angle in the hydraulic drive. So remember: real load sharing means speed, frequency and torque, through the C S D.
Part 3 · Load sharing
Inside the real load sharing loop Kirchhoff: the error currents add to zero (+1.0 − 0.5 − 0.5 = 0) load sharing loop: loop current = average of the three = 5 A GEN 1 → bus CT: 6.0 A error detector +1.0 A reduce torque to CSD 1 governor GEN 2 → bus CT: 4.5 A error detector -0.5 A increase torque to CSD 2 governor GEN 3 → bus CT: 4.5 A error detector -0.5 A increase torque to CSD 3 governor
Chapter 12 · Paralleling, Load Sharing and Protection
15
e-books by eatpl.in · © 2026 · Do not copy or distribute
How does the system know which drive to correct? A current transformer on each generator output senses its load. The secondaries of the three current transformers are joined in series in one loop, and across each one sits an error detector. When the load is balanced, every current transformer gives the same current, say five amps, the loop carries those five amps, and nothing flows through the error detectors. Now suppose drive one gives more torque and generator one takes extra load: its transformer gives six amps, while the other two fall to four and a half amps each. The loop current settles at the average, five amps. By Kirchhoff's first law, the difference at each transformer must flow through its error detector: plus one amp for number one, minus half an amp for the others. Amplified, these signals tell drive one to reduce torque and drives two and three to increase, until the error currents vanish.
Part 3 · Load sharing
Reactive load sharing: excitation A separate loop, laid out like the real-load loop A mutual reactor (phase-shifting transformer) makes it respond only to current 90° out of phase with the voltage The error signal goes to each voltage regulator , which changes the exciter field current Generator with low kVAR : excitation raised ; high kVAR: excitation lowered Equal voltages (excitation) give equal reactive loads V current I (lagging) in phase: kW 90°: kVAR Reactive sharing looks only at the part 90° out of phase Current transformer senses gen current Mutual reactor phase-shifting: keeps 90° part Error detector compares with the others Voltage regulator in the GCU Exciter field current up or down Low kVAR on one generator? → raise its excitation High kVAR on one generator? → lower its excitation
Chapter 12 · Paralleling, Load Sharing and Protection
16
e-books by eatpl.in · © 2026 · Do not copy or distribute
Reactive load sharing uses a second, completely separate loop that looks much like the real-load loop. Again current transformers sense each generator's current, but this time the error detector must see only the reactive part. That is the job of the mutual reactor, a phase-shifting transformer which makes the circuit respond only to the part of the current that is ninety degrees out of phase with the voltage. The error signals go not to the drives but to the voltage regulators, which change the current in each exciter field. If one generator is carrying too little reactive load, its excitation is raised; if it carries too much, its excitation is lowered. The idea is simple: when paralleled generators have identical voltages, they share the reactive load equally. So reactive load sharing means excitation, field current, through the voltage regulator.
Part 3 · Load sharing
Real versus reactive: the exam table Real load Reactive load Units kW (true power)kVAR (wattless load)Shared by adjusting Drive torque (speed, frequency)Excitation (exciter field current)Controlled through Load controller → CSD governor / swash plate Voltage regulator (in the GCU)Sensing CTs in series loop + error detectors CTs + mutual reactor (90° part) + error detectors To increase a generator's share Increase its drive torque Increase its field excitation Connected when? Only while in parallel (BTB closed) Only while in parallel (BTB closed)
A generator running on its own (for example after engine start, before its BTB closes) is not connected to either load sharing loop.
Chapter 12 · Paralleling, Load Sharing and Protection
17
e-books by eatpl.in · © 2026 · Do not copy or distribute
This table is worth learning by heart. Real load is measured in kilowatts and is shared by adjusting drive torque, which we can also describe as speed or frequency control, through the load controller and the C S D governor. Reactive load is measured in K V A R and is shared by adjusting excitation, the exciter field current, through the voltage regulator. Real sharing uses current transformers in a series loop with error detectors; reactive sharing adds a mutual reactor so it sees only the ninety degree part. To make a generator take more real load, increase its drive torque, not its excitation. To make it take more reactive load, increase its excitation. Last row: the load sharing circuits only matter when generators are in parallel, so a generator running on its own, for example just after engine start before its tie breaker closes, is not connected to either loop.
Part 3 · Load sharing
Load, voltage and frequency meters One load meter per generator : reads kW normally, kVAR while a button is pressedkW = real load available to do work at the bus; kVAR = reactive load Usually one voltmeter and one frequency meter , shared through a multi-position selector Selector also reads APU , ground power and RAT supplies Electronic displays often show load as a percentage of maximum LOAD (kW · press for KVAR) 0 20 40 60 80 100 kW GEN 1 0 20 40 60 80 100 kW GEN 2 0 20 40 60 80 100 kW GEN 3 KVAR 90 100 110 120 130 V AC VOLTS 360 380 400 420 440 Hz FREQUENCY GEN 1 GEN 2 GEN 3 APU EXT SELECTOR
Chapter 12 · Paralleling, Load Sharing and Protection
18
e-books by eatpl.in · © 2026 · Do not copy or distribute
On the panel of a paralleled system you will find one load meter for each generator. Each meter normally reads kilowatts, the real load, and while a K V A R button is pressed it shows the reactive load instead. Comparing the meters is how the crew sees that load sharing is working: in the drawing all three generators carry about forty-five kilowatts. Voltage and frequency are usually read on just one voltmeter and one frequency meter, which are switched between sources by a multi-position selector. The selector normally has positions for each engine generator and also for the A P U, the ground power unit, and the ram air turbine where one is fitted. On aircraft with electronic system displays, the load is often shown simply as a percentage of the maximum that generator can supply.
Part 4 · Protection
The protection toolkit GCB Generator circuit breaker: connects a generator to its own load bus .
BTB Bus tie breaker: joins two buses. Normally closed in parallel systems, normally open in split systems.
GCR Generator control (field) relay: in the excitation circuit . Opening it kills the generator's field.
Discrimination Selective tripping of GCBs and BTBs so only the faulty part is disconnected.
Differential protection Compares generator current with bus-end current to find feeder faults .
Limits monitored Over/under voltage , over/under frequency , over/under excitation , phase sequence.
GCU One per generator: voltage regulation plus protection; works with the BPCU .
Warnings GEN FAIL light when its GCB trips , with the master warning system.
Chapter 12 · Paralleling, Load Sharing and Protection
19
e-books by eatpl.in · © 2026 · Do not copy or distribute
Once generators are paralleled, protection becomes essential, and here is the toolkit. The generator circuit breaker connects each generator to its own load bus. The bus tie breaker joins two buses; it is normally closed in a paralleled system and normally open in a split system, and it will only close when the synchronising unit is satisfied. The generator control relay sits in the excitation circuit, so opening it removes the generator's field. Discrimination circuits trip the breakers selectively, so that only the faulty part is disconnected. Differential protection compares currents to find faults in a feeder. Other circuits watch for over and under voltage, over and under frequency, over and under excitation, and wrong phase sequence. A generator control unit looks after each generator, working with the bus power control unit. And a generator fail light comes on whenever its generator breaker trips.
Part 4 · Protection
The generator control unit and the GCR One GCU per generator : voltage regulation by controlling the exciter field current Protection: over/under voltage, over-current, frequency, phase sequence, differential current The GCR (exciter control / field relay) is in the excitation circuit Dangerous fault: GCR opens, output falls to a residual value ; GCB opens In a paralleled system the bus stays live from the others through its BTB GCU Voltage regulator Protection logic OV/UV · OF/UF · over-current phase sequence · differential PMG powers the GCU GCR Exciter field Exciter + rectifier Main rotor field Main stator GCB bus Dangerous fault (over-voltage, over-excitation): 1. open the GCR: field collapses, output falls to a residual value 2. open the GCB: generator off its bus (bus fed via BTB)
Chapter 12 · Paralleling, Load Sharing and Protection
20
e-books by eatpl.in · © 2026 · Do not copy or distribute
In a modern system each generator has its own generator control unit, the G C U. It regulates the voltage by controlling the current in the exciter field, and it houses the protection circuits: over and under voltage, over-current, frequency, phase sequence and differential current. On many generators a small permanent magnet generator on the same shaft supplies the G C U with its own power. The G C U also contains the generator control relay, also called the exciter control relay or field relay. Notice where it sits: in the excitation circuit, between the regulator and the exciter field, not in the output. If a dangerous fault occurs, such as over-voltage or over-excitation, the G C U opens this relay, the field collapses and the output falls to a small residual value, making the generator safe. It also opens the generator breaker. In a paralleled system, that bus keeps its power from the other generators through its tie breaker.
Part 4 · Protection
Differential protection Two current transformers: one at the generator star-point end , one at the bus end of the feeder Healthy feeder: current out = current in , so the difference is zero A difference means current is leaking: line-to-earth or line-to-line fault Response: open the GCR and the GCB to isolate the generator The BPCU uses CTs at each generator and bus to isolate faulty generators or buses and reconfigure Differential protection generator star point CT 1 CT 2 bus feeder cable (protected zone) earth fault CT 1 CT 2 compare result No fault 180 A 180 A difference 0 A no action Feeder fault 180 A 120 A difference 60 A trip GCR + GCB
Chapter 12 · Paralleling, Load Sharing and Protection
21
e-books by eatpl.in · © 2026 · Do not copy or distribute
Differential protection guards the feeder cables between a generator and its bus, which can run many metres through the wing and fuselage. A current transformer at the star-point end of the generator windings measures the current leaving the generator, and a second one near the bus measures the current arriving. In a healthy feeder those two currents are equal, so the difference is zero. In this example a cable has chafed and shorted to the airframe: one hundred and eighty amps leave the generator, but only one hundred and twenty arrive at the bus. The missing sixty amps are going to earth. The differential circuit sees that difference and opens the generator control relay and the generator breaker. The same principle, with current transformers at each generator and each bus, lets the bus power control unit, the B P C U, isolate a faulty generator or bus bar and reconfigure the system to keep as much as possible working.
Part 4 · Protection
Discrimination: isolate only the faulty part 1 · Fault on load bus 2 SYNC BUS BTB GCB GEN 1 BTB GCB GEN 2 BTB GCB GEN 3 all generators feed the fault 2 · Open BTB 2 first SYNC BUS BTB GCB GEN 1 BTB GCB GEN 2 BTB GCB GEN 3 healthy generators protected 3 · Then open GCB 2 SYNC BUS BTB GCB GEN 1 BTB GCB GEN 2 BTB GCB GEN 3 fault isolated; 1 and 3 carry on Generator fault: open its GCB ; the BTB stays closed so its bus is fed from the others. Load-bus fault: open the BTB first , then the GCB .
Chapter 12 · Paralleling, Load Sharing and Protection
22
e-books by eatpl.in · © 2026 · Do not copy or distribute
Discrimination means the protection must find the faulty part and disconnect only that. Consider an earth fault on load bus two of a paralleled system. Every generator now feeds it: generator two through its own breaker, and the other generators through the synchronising bus and tie breaker two. Opening generator breaker two alone would not help, because the healthy generators would go on feeding the fault through the tie bus. So the tie breaker opens first, protecting the healthy generators. Then generator breaker two opens second, and the fault is completely isolated, while generators one and three carry on in parallel. So a fault on a load bus needs both its B T B and its G C B to open. Compare a fault inside generator two itself: then only its G C B opens, and the tie breaker stays closed so its load bus is fed from the others.
Part 4 · Other sources
Emergency and alternative AC sources APU generator : APU runs at constant speed, so no CSD ; 115/200 V 400 HzAPU generator is never paralleled with engine generators: it feeds a bus only when no other source does RAT : drops into the airflow; limited flight instruments and radio (many now drive a hydraulic pump instead)Static inverter : DC → AC , fed from the battery or essential DC bus, for limited instruments and radioHydraulic-motor-driven generator on some typesAPU generator constant speed: no CSD RAT generator deploys into the airflow Static inverter DC from battery → AC Hydraulic-motor gen driven by aircraft hydraulics Essential AC bus flight instruments, radios, essentials Static inverter: 115 V 400 Hz for limited instruments and radio APU generator: never in parallel with the engine generators
Chapter 12 · Paralleling, Load Sharing and Protection
23
e-books by eatpl.in · © 2026 · Do not copy or distribute
If some or all of the engine-driven generators fail, there are other ways to make A C. The A P U drives its own generator, and because the A P U runs at a constant speed, it needs no constant speed drive. It is used for ground power and, on many aircraft, as a back-up in flight. The key rule: the A P U generator is not paralleled with the engine generators, and it only feeds a bus when no other source is feeding it. The ram air turbine drops into the airflow and drives a small generator for limited flight instruments and radio, although on many modern aircraft it drives a hydraulic pump instead, because the flying controls need hydraulics. The static inverter is a solid-state device that turns D C from the battery or the essential D C bus into four hundred hertz A C. Some types also have a generator driven by a hydraulic motor.
Part 4 · Other sources
Ground power: protected connection Standard ground power unit: 115/200 V, 400 Hz, three-phase Can supply all the aircraft services on the ground Will not connect while the aircraft's own generators are supplying the buses Will not connect with the wrong phase sequence Rejected and switched off if over-voltage occurs; generators are taken off line while it feeds Ground power unit 115/200 V · 400 Hz · 3φ Phase sequence correct? no reject / trip yes Voltage and frequency in limits? no reject / trip yes Aircraft generators off line? no reject / trip yes EXT PWR contactor closes feeds the tie / sync bus Generators and ground power are never paralleled
Chapter 12 · Paralleling, Load Sharing and Protection
24
e-books by eatpl.in · © 2026 · Do not copy or distribute
Ground power for an A C aircraft must match the aircraft standard: one hundred and fifteen and two hundred volts, four hundred hertz, three-phase. Plugged in, it can run every service on the aircraft. Because ground power is just another A C source, it must never end up in parallel with the aircraft's own generators, so the protection circuits will not connect it while the generators are supplying the bus bars; when external power is feeding the buses, the aircraft generators are off line. The protection also checks the phase sequence. If two phases were swapped in the cable, every three-phase motor on the aircraft would run backwards, fuel pumps and fans included, so a wrong sequence is rejected. And if the ground unit produces an over-voltage, it is rejected and switched off at source. Only when everything is correct does the external power contactor close.
Part 4 · Controls
Typical controls on a paralleled system AC TIE (SYNC) BUS BTB CLOSE TRIP GEN BUS 1 GCB CLOSE TRIP FIELD CLOSE TRIP GEN 1 °C IDG OIL LOW PRESS OVERHEAT DISCONNECT (guarded) BTB CLOSE TRIP GEN BUS 2 GCB CLOSE TRIP FIELD CLOSE TRIP GEN 2 °C IDG OIL LOW PRESS OVERHEAT DISCONNECT (guarded) BTB CLOSE TRIP GEN BUS 3 GCB CLOSE TRIP FIELD CLOSE TRIP GEN 3 °C IDG OIL LOW PRESS OVERHEAT DISCONNECT (guarded) Green CLOSE lights and the flow bar show the path is made; TRIP opens it Switch-lights for the field (GCR) , GCB and BTB of each generator; IDG oil temperature and a guarded drive disconnect with LOW PRESS and OVERHEAT lights.
Chapter 12 · Paralleling, Load Sharing and Protection
25
e-books by eatpl.in · © 2026 · Do not copy or distribute
Here is a typical electrical panel for a three-generator paralleled system, drawn as a mimic of the buses. For each generator, the field switch-light controls the excitation through the generator control relay: close, and a green flow bar shows the field is made, so you can check voltage and frequency on the selector meters; trip, and the field opens and the voltage falls to zero. Above it, the generator breaker switch-light connects the generator to its own bus, and above that the bus tie breaker switch-light joins that bus to the tie bus. Normally all three tie breakers are closed, so the three generators share the load. To the left of each column are the I D G oil temperature gauge and the drive disconnect switch, guarded against accidental use, with low pressure and overheat warning lights in it. The A P U generator needs no drive, because the A P U runs at constant speed.
Summary
What to take into the exam REAL load · kW torque · speed · frequency CSD / load controller REACTIVE load · kVAR excitation · field current voltage regulator / GCU Frequency wild Driven direct; f follows rpm; heaters and de-icing; never paralleled ; inverter for CF AC.
Before paralleling Same V, f, phase, phase sequence; load sharing available. Dark lamps = close.
Layout GCB → load bus; BTB → sync bus (no loads). APU/GPU only with GCBs open.
Protection GCR in excitation circuit; differential compares gen and bus current; load-bus fault: BTB then GCB.
Chapter 12 · Paralleling, Load Sharing and Protection
26
e-books by eatpl.in · © 2026 · Do not copy or distribute
Let us pull it together. A frequency-wild generator is driven straight from the engine, its frequency follows engine speed, it suits heaters and de-icing, and it can never be paralleled; an inverter gives constant-frequency A C if needed. Before any paralleling, voltage, frequency, phase and phase sequence must match, and a means of load sharing must be available; with the dark-lamp method, close the breaker when the lamps are dark. Each generator feeds its own load bus through its G C B, and the load buses join the synchronising bus, which has no loads, through the B T Bs. Real load, in kilowatts, is shared by drive torque through the C S D; reactive load, in K V A R, by excitation through the voltage regulator. The generator control relay sits in the excitation circuit, differential protection compares generator and bus currents, and a load-bus fault opens the B T B first, then the G C B.