Electrics · Chapter 13
Practical Aircraft AC Systems How real aircraft distribute AC power: feeders and the electrical bay, the split bus system and its failure modes, a typical twin-jet network, and the four-generator paralleled system.
E&E bay feeders from each engine meet at the electrical bay AC BUS 1 AC BUS 2 BTB open GEN 1 GEN 2 APU © 2026 eatpl.in. For the personal study of eatpl.in students only. Do not copy or distribute.
e-books by eatpl.in · © 2026 · Do not copy or distribute
Chapter thirteen puts everything together on real aircraft. We follow the power from the generators on the engines and the A P U to the electrical bay under the flight deck, and see how the bus bars are arranged so that a failure loses as little as possible. Then we work through the split bus system used on most twin jets, normal operation, one generator failed and both failed, before looking at a typical twin-jet network and finishing with the four-generator paralleled system and its split system breaker.
Road map
From generator to bus bar on a real aircraft Distribution Split bus Twin-jet example Parallel bus Distribution Feeders run to the electrical bay; buses are arranged in a hierarchy of importance.
Split bus Two isolated generators, a normally open BTB, TRUs, a static inverter and the battery.
Twin-jet example A typical modern twin-jet network, its panel and its emergency sources.
Parallel bus Four generators, two synchronising buses and a split system breaker.
Chapter 13 · Practical Aircraft AC Systems
2
e-books by eatpl.in · © 2026 · Do not copy or distribute
This chapter takes the ideas of the last two chapters and puts them on real aircraft. First, distribution: how the cables get from the generators to the electrical bay, and how the bus bars are arranged in order of importance. Second, the split bus system that most twin jets use, with its two isolated generators, a bus tie breaker that is normally open, transformer rectifier units, a static inverter and the battery. We will work through it normally, with one generator failed and with both failed. Third, a typical modern twin-jet network and its overhead panel. And finally the paralleled system of a large four-engine aircraft, with two synchronising buses joined by a split system breaker.
Part 1 · Distribution
From the generators to the electrical bay GEN 1 GEN 2 APU GEN E&E bay Feeders: engine → pylon → wing → fuselage → electrical bay under the flight deck
Chapter 13 · Practical Aircraft AC Systems
3
e-books by eatpl.in · © 2026 · Do not copy or distribute
On a twin jet there is one generator mounted on, and driven by, each engine, and a third generator on the A P U. Watch the scene. The feeder cables from each engine generator run up through the pylon, inboard along the wing, and into the fuselage, then forward beneath the cabin floor. They all meet at a central distribution compartment, usually beneath the flight deck or the cabin floor, often called the electrical and electronics bay. The A P U generator, in the tail cone, has its own feeder running the length of the fuselage to the same place. Bringing everything to one compartment keeps the heavy switching equipment together, close to the flight deck that controls it, and keeps the distances to the main bus bars short.
Part 1 · Distribution
Inside the electrical bay GCBs and BTBs , the main contactorsGCUs or voltage regulators, and current transformers Main bus bars and the bus protection circuitsBattery and battery charger Bus bar extensions run up to the flight-deck circuit breaker panels (rear, side, overhead)Fuses and circuit breakers protect both AC and DC circuitsFLIGHT DECK overhead CB panel side CB panel rear CB panel floor bus bar extensions E&E BAY (distribution compartment) GCBs and BTBs GCUs / voltage regulators current transformers main bus bars bus protection unit battery and charger
Chapter 13 · Practical Aircraft AC Systems
4
e-books by eatpl.in · © 2026 · Do not copy or distribute
What will you find in the electrical bay? Most of the components we met in the last chapter: the generator circuit breakers and bus tie breakers, the generator control units or voltage regulators, the current transformers for the protection circuits, the main bus bars themselves and the bus protection circuitry. The battery and its charger are usually here too. The bus bars do not stop in the bay. Bus bar extensions run up to the flight deck, behind the circuit breaker panels on the rear, side and overhead panels, so that the crew can reach the breaker for each service. Remember that circuit breakers and fuses are used in A C circuits just as much as in D C circuits: any circuit, whatever its supply, needs protection for its wiring.
Part 1 · Distribution
The generator feeder line Line current transformers at the generator endAn engine/wing disconnect so the engine can be changed A long feeder cable through wing and fuselage The generator breaker in the bay, then the load buses The APU generator has its own APU generator breaker The CTs let differential protection guard the whole feeder ENGINE / WING CSD gen 1 line CTs engine/wing disconnect feeder cable through wing and fuselage E&E BAY GEN BKR 1 load buses APU gen APU GEN BKR Line CTs feed the differential protection of the whole feeder
Chapter 13 · Practical Aircraft AC Systems
5
e-books by eatpl.in · © 2026 · Do not copy or distribute
Let us follow one feeder. At the generator end, line current transformers sense the current in each phase. A disconnect at the engine and wing joint lets the engine be removed without cutting cables. Then a long feeder cable runs through the wing and fuselage to the electrical bay, where the generator breaker connects it to the load buses. The A P U generator has its own feeder and its own A P U generator breaker. Why does this matter? A feeder is many metres long, passes through areas where it could be chafed or damaged, and carries very large currents. The line current transformers at the generator end, compared with the transformers near the bus, give the differential protection we met in chapter twelve: a fault anywhere along the feeder shows up as a difference, and the generator is tripped off.
Part 1 · Distribution
A hierarchy of bus bars Loads are grouped by importance , not by system Main buses : galleys and other non-essential loads; shed firstEssential buses : services needed for safe flight and landingStandby and battery buses: the minimum to the very endHot battery bus : wired straight to the battery (fire extinguishers, clocks)Failures move power down the hierarchy automatically AC side DC side Main AC buses galleys, non-essentials Essential AC bus vital AC services Standby AC bus basic instruments Main DC buses from the TRUs Essential DC bus vital DC services Battery bus emergency loads Hot battery bus wired to the battery lost first ↑ · kept longest ↓
Chapter 13 · Practical Aircraft AC Systems
6
e-books by eatpl.in · © 2026 · Do not copy or distribute
Aircraft bus bars are arranged in a hierarchy of importance. At the top are the main A C buses fed by the generators, carrying non-essential loads such as the galleys and cabin services. When generating capacity is lost, these are the first to be shed. Below them are the essential buses, which carry everything needed for continued safe flight and landing. Below those come the standby buses and the battery bus, which carry the bare minimum of instruments, radios and lighting, and can be fed from the battery when everything else has failed. At the very bottom is the hot battery bus, wired straight to the battery, for items such as fire extinguisher squibs that must always have power. The system is designed so that as failures pile up, power is automatically switched down this hierarchy, losing the least important loads first.
Part 2 · Split bus system
The split bus system at a glance AC BUS 1 AC BUS 2 BTB (open) APU GEN EXT ground power GCB 1 GEN 1 GCB 2 GEN 2 AC ESS BUS changeover STATIC INV TRU 1 TRU 2 ESS DC BUS NON-ESS DC BUS DC isolation relay (closed) BATTERY BUS battery relay Two non-paralleled 115/200 V 400 Hz generators: no paralleling or load sharing circuits. BTB open , DC isolation relay closed .
Chapter 13 · Practical Aircraft AC Systems
7
e-books by eatpl.in · © 2026 · Do not copy or distribute
Here is the complete split bus system. The primary power comes from two constant-frequency generators, one hundred and fifteen and two hundred volts at four hundred hertz, three-phase. They are not designed to run in parallel, so there are no paralleling or load sharing circuits at all. Generator one feeds A C bus one, generator two feeds A C bus two, and the bus tie breaker between them is normally open. The A P U generator and external power can join the tie through their own breakers. The essential A C bus is fed from A C bus one through a changeover relay, with a static inverter as its standby. On the D C side, two transformer rectifier units turn A C into twenty-eight volts D C: number one feeds the essential D C bus and number two the non-essential D C bus, and a D C isolation relay joins them. The battery bus feeds the essential D C bus through a battery relay.
Part 2 · Split bus system
Normal operation: two separate halves Each generator feeds its own AC bus and its own TRU The BTB is open : the generators are never in parallel Essential AC loads come from No 1 AC bus via the changeover relay The static inverter is on standby, not in use Simple: no synchronising or load sharing needed Normal: BTB open, generators isolated AC ESS BUS changeover STATIC INV BATTERY AC BUS 1 AC BUS 2 BTB TRU 1 28 V DC TRU 2 28 V DC GCB 1 GEN 1 GCB 2 GEN 2
Chapter 13 · Practical Aircraft AC Systems
8
e-books by eatpl.in · © 2026 · Do not copy or distribute
In normal operation the split bus system really is two separate halves. Each generator feeds its own A C bus and, through it, its own transformer rectifier unit. The bus tie breaker in the middle is open, so the two generators are never connected together, and that is why no synchronising or load sharing circuits are needed. Notice how the essential A C bus is fed. It does not have a generator of its own: it takes its power from the number one A C bus through a changeover relay. That relay is the key to what happens when things go wrong, because it can switch the essential bus to another source. In normal flight the static inverter is simply standing by, and the battery is kept charged.
Part 2 · Split bus system
The DC side of a split bus system 28 V DC comes from two TRUs , not from DC generators TRU 1 feeds the essential DC bus; TRU 2 the non-essential DC busNormally the two DC buses are joined by the DC isolation relay The batteries feed the battery bus , and through the battery relay the essential DC bus Both generators lost: the isolation relay opens , separating essential from non-essential AC BUS 1 AC BUS 2 TRU 1 TRU 2 ESSENTIAL DC BUS NON-ESS DC BUS isolation relay opens if both generators fail battery relay BATTERY BUS BATTERIES STATIC INV → AC ESS when needed TRU 1 → essential DC TRU 2 → non-essential DC batteries → battery bus
Chapter 13 · Practical Aircraft AC Systems
9
e-books by eatpl.in · © 2026 · Do not copy or distribute
On an A C aircraft the D C needs are met by transformer rectifier units, not by batteries or D C generators. In the split bus system, T R U one, fed from A C bus one, supplies the essential D C bus, and T R U two, fed from A C bus two, supplies the non-essential D C bus. In normal operation the two D C buses are joined by the D C isolation relay, so the two transformer rectifiers share the D C load. The batteries are connected directly to the battery bus, and through the battery relay they also connect to the essential D C bus, where they are kept charged. If one generator fails, both T R Us are still supplied through the closed bus tie breaker, so every D C consumer keeps its power. Only if both generators fail does the isolation relay open, cutting the non-essential D C bus away so the battery supports only the essentials.
Part 2 · Split bus system
One generator fails Failed generator's GCB opens ; the BTB closes automatically The remaining generator now feeds both AC buses and both TRUs All bus bars stay powered: the two buses act as one One generator may not carry everything: galley load is shed Example: 55 + 50 = 105 kVA > 90 kVA rating; shed 25 kVA → 80 kVA One generator left: 90 kVA rating 0 30 60 90 120 Generator load (kVA) rating 90 kVA 55 Gen 1 50 Gen 2 105 Gen 1 80 Gen 1 normal Gen 2 fails galley shed (BTB closed) (−25 kVA)
Chapter 13 · Practical Aircraft AC Systems
10
e-books by eatpl.in · © 2026 · Do not copy or distribute
Now suppose generator two fails. Watch the scene: as the generator fails, its control unit opens its breaker, and a moment later the bus tie breaker closes automatically. The two main buses now act as one bus bar, and generator one feeds both of them, both transformer rectifiers, and the essential bus as before. Every bus bar keeps its power. But look at the load gauge. In our example the two buses were carrying fifty-five and fifty K V A, a total of one hundred and five, which is more than the ninety K V A rating of one generator. So the system must shed load, typically the galleys, and here shedding twenty-five K V A brings generator one down to a comfortable eighty. Note that the bus tie breaker never closes while both generators are on line, so they are still never in parallel.
Part 2 · Split bus system
Bringing in the APU generator After a generator failure the APU can be started in flight Its generator connects to AC bus 1 or AC bus 2 in place of the failed one The BTB opens again: still one source per bus APU generator is never paralleled with an engine generator In flight it may be able to supply only one bus bar (altitude limits) On the ground, APU or external power can feed everything Getting back to two sources 1 Gen 2 fails BTB closes: Gen 1 feeds both buses 2 Start the APU from the battery (in flight, within its envelope) 3 APU GEN on line takes AC bus 2 through its breaker 4 BTB opens again split system restored: Gen 1 + APU GEN Never paralleled: one source per bus
Chapter 13 · Practical Aircraft AC Systems
11
e-books by eatpl.in · © 2026 · Do not copy or distribute
With one generator gone, the crew will normally start the A P U in flight, using the battery, to get back to two independent sources. Its generator then connects to the bus that lost its own generator, A C bus one or A C bus two, and the bus tie breaker opens again so that each bus has one source. The rule from the last chapter still applies: the A P U generator is never paralleled with an engine-driven generator; it only feeds a bus that has no other source. Be aware of a limitation too. On some aircraft the A P U generator can only supply one bus bar in flight, because the A P U produces less power at altitude. On the ground there is no such problem, and either the A P U or external power can feed every service on the aircraft.
Part 2 · Split bus system
Both generators fail Non-essential AC services are lost The changeover relay moves the essential AC bus to the static inverter The DC isolation relay opens : non-essential DC lost Essential DC and the inverter run from the battery bus Fully charged batteries: about 30 minutes Example: 46 Ah ÷ 75 A ≈ 37 min; 80% usable ≈ 29 min Both failed: AC ESS from the static inverter AC ESS BUS changeover STATIC INV BATTERY AC BUS 1 AC BUS 2 BTB TRU 1 28 V DC TRU 2 28 V DC GCB 1 GEN 1 GCB 2 GEN 2
Chapter 13 · Practical Aircraft AC Systems
12
e-books by eatpl.in · © 2026 · Do not copy or distribute
Now the worst case: both generators fail. Watch the scene as both generators run down and their breakers open. Both main A C buses go dead, so every non-essential A C service is lost, and with them both transformer rectifiers. Two things happen automatically. The changeover relay switches the essential A C bus from A C bus one to the static inverter, which turns battery D C into four hundred hertz A C. And on the D C side the isolation relay opens, cutting away the non-essential D C bus. The essential A C and D C loads are now running from the battery. With fully charged batteries this should last about thirty minutes. As a check: two twenty-three amp-hour batteries supplying seventy-five amps would last about thirty-seven minutes in theory, or around twenty-nine if only eighty per cent of the capacity is usable.
Part 2 · Split bus system
Who feeds what: the split bus in four states AC bus 1 AC bus 2 AC essential Essential DC Non-ess DC Normal Gen 1 Gen 2 AC bus 1 (changeover) TRU 1 (+ TRU 2 via isolation relay) TRU 2 Gen 2 failed Gen 1 Gen 1 via BTB AC bus 1 TRU 1 TRU 2 (still fed) Both failed lost lost Static inverter Battery bus lost (isolation relay open)On the ground EXT or APU EXT or APU AC bus 1 TRU 1 TRU 2
The BTB closes only when a source is missing, so two sources are never connected together.
Chapter 13 · Practical Aircraft AC Systems
13
e-books by eatpl.in · © 2026 · Do not copy or distribute
This table sums up the split bus system and is well worth learning. Normally generator one feeds A C bus one, generator two feeds A C bus two, the essential A C bus is fed from bus one through the changeover relay, T R U one feeds the essential D C bus and T R U two the non-essential D C bus. With generator two failed, the bus tie breaker closes and generator one feeds both A C buses, so nothing is lost apart from any load that has to be shed. With both generators failed, both A C buses and the non-essential D C bus are lost, the essential A C bus is fed by the static inverter, and the essential D C bus by the battery bus. On the ground, external power or the A P U feeds everything. In every case, each bus has just one source.
Part 2 · Split bus system
External power and the APU on the ground External power or the APU can feed all the aircraft services Connected at the tie : both AC buses and TRUs powered It is never paralleled with an engine generator: generators go off line The battery starts the APU and gives power and air on the ground Ground power is rejected if its phase sequence or voltage is wrong On the ground: external power feeds everything AC ESS BUS changeover STATIC INV BATTERY AC BUS 1 AC BUS 2 BTB EXT PWR ground power TRU 1 28 V DC TRU 2 28 V DC GCB 1 GEN 1 GCB 2 GEN 2
Chapter 13 · Practical Aircraft AC Systems
14
e-books by eatpl.in · © 2026 · Do not copy or distribute
On the ground, with the engines stopped, the aircraft runs either on external power or on the A P U. In a split bus system either one can supply all the aircraft services. It is connected at the tie between the two main buses, so with the bus tie breaker closed it feeds both A C buses, both transformer rectifiers and, through the changeover relay, the essential A C bus. External power is never paralleled with the aircraft generators. It does not automatically match itself to a generator that is already on line; instead, the generators are taken off line while it feeds the buses. The battery has a job here too: it provides the power to start the A P U, and the A P U then gives electrical power and air on the ground while the engine-driven generators are off line.
Part 3 · A typical twin jet
A modern twin-jet network Normal state: orange / green = powered; grey dashed = standby paths GEN 1 (IDG 90 kVA) GEN 2 (IDG 90 kVA) APU GEN 90 kVA EXT PWR ground AC BUS 1 AC BUS 2 bus tie contactors (close only when a side needs a source) AC ESS BUS normal feed alternate feed TR 1 TR 2 DC BUS 1 DC BUS 2 DC BAT BUS DC ESS BUS BAT 1 + 2 ESS TR EMER GEN (RAT) STAT INV (BAT 1) RAT → blue hydraulics → generator battery DC → 115 V AC A320-family figures: two 90 kVA IDGs , a 90 kVA APU generator , three TRs , two 23 Ah batteries, a static inverter and a RAT-driven emergency generator .
Chapter 13 · Practical Aircraft AC Systems
15
e-books by eatpl.in · © 2026 · Do not copy or distribute
Here is how a typical modern twin jet, such as the A320 family, applies the split bus idea. Two integrated drive generators of ninety K V A each feed A C bus one and A C bus two. The A P U generator, also ninety K V A, and external power connect through bus tie contactors, which only close when one side needs a source. The A C essential bus is normally fed from A C bus one, with A C bus two as the alternate feed, selected on the A C ESS FEED button. Transformer rectifier one feeds D C bus one, transformer rectifier two feeds D C bus two, and D C bus one feeds the D C battery bus, which feeds the D C essential bus. Behind all this sit the emergency sources: an essential transformer rectifier, an emergency generator powered by the ram air turbine through the hydraulic system, a static inverter, and two batteries.
Part 3 · A typical twin jet
The overhead ELEC panel and the system display GEN 1, APU GEN, GEN 2 push-buttons: FAULT and OFF lightsIDG disconnect buttons, guarded : FAULT for low oil pressure or high oil temperatureEXT PWR : AVAIL when plugged in and good; ON when connectedBUS TIE AUTO, AC ESS FEED (NORM / ALTN), GALY & CAB load sheddingSystem display page: % load, volts and hertz for each source, buses green or amber ELEC 28.2 28.1 FAULT OFF BAT 1 FAULT OFF BAT 2 FAULT DISC IDG 1 FAULT DISC IDG 2 FAULT OFF GEN 1 FAULT OFF APU GEN FAULT OFF GEN 2 AVAIL ON EXT PWR FAULT OFF BUS TIE FAULT ALTN AC ESS FEED FAULT OFF GALY & CAB
Chapter 13 · Practical Aircraft AC Systems
16
e-books by eatpl.in · © 2026 · Do not copy or distribute
The overhead electrical panel of a modern twin jet is laid out as a mimic of the network. Battery buttons sit at the top with their voltage displays. The generator buttons for generator one, the A P U generator and generator two show a FAULT light if a generator trips, and OFF when deselected. The I D G disconnect buttons are guarded against accidental use, and their FAULT light warns of low oil pressure or high oil temperature in the drive; once disconnected, the drive can only be reconnected on the ground. The external power button shows AVAIL when good ground power is plugged in and ON when it is connected. Bus tie, A C essential feed and galley and cabin buttons complete the panel. On the system display page, each source shows its load as a percentage, its voltage and frequency, and each bus is drawn green when powered.
Part 4 · Parallel bus system
A four-generator paralleled system SYNC BUS (left) SYNC BUS (right) SSB split system breaker BTB 1 LOAD BUS 1 GCB 1 GEN 1 BTB 2 LOAD BUS 2 GCB 2 GEN 2 BTB 3 LOAD BUS 3 GCB 3 GEN 3 BTB 4 LOAD BUS 4 GCB 4 GEN 4 Each generator: GCB to its load bus. Load buses: BTBs (normally closed) to a synchronising bus. Two sync buses: joined by the SSB .
Chapter 13 · Practical Aircraft AC Systems
17
e-books by eatpl.in · © 2026 · Do not copy or distribute
Large four-engine aircraft, such as the seven four seven four hundred, use a paralleled system. Each generator feeds its own load bus through its generator breaker, and each load bus connects through a bus tie breaker, normally closed, to a synchronising bus. Here there are two synchronising buses, one for each pair of generators, and they are joined in the middle by a split system breaker, the S S B. With the split system breaker closed, all four generators are in parallel and share the whole aircraft load. Watch it open, as it would for an autoland: the system splits into two independent paralleled pairs. Afterwards it closes again and all four share the load once more. The purpose of the synchronising bus is simply to make the interconnections between the generator buses.
Part 4 · Parallel bus system
Bringing generators on line First the field is excited , bringing the output within limits Then the GCB closes , connecting the generator to its load bus The GCB then stays closed in all normal operation BTBs are normally closed , so the generator is now on the sync bus The second generator of a pair joins only when voltage, frequency and phase sequence are satisfied Bringing generators on line 1 Excite the field field switch / GCR closed 2 Output within limits voltage and frequency checked 3 GCB closes generator → its load bus 4 BTB already closed so it is now on the sync bus 5 Next generator GCB closes only when V, f and phase sequence match
Chapter 13 · Practical Aircraft AC Systems
18
e-books by eatpl.in · © 2026 · Do not copy or distribute
How does a paralleled system come on line? It starts with excitation. The generator field is switched on, and the output builds up until voltage and frequency are within the limits needed before the generator breaker may close. When it does close, the generator is connected to its own load bus, and the breaker then stays closed for all normal operation. Because the bus tie breakers are normally closed, closing the generator breaker effectively connects the generator to its synchronising bus. Now, when the other generator of that pair comes on line, it too is joined to the synchronising bus, but only once its voltage, frequency and phase sequence have been checked, by the synchronising unit, against the generator already there. Only then is its breaker allowed to close, putting the two in parallel.
Part 4 · Parallel bus system
The split system breaker The SSB joins or separates the two synchronising buses Closed : all generators in parallel, sharing the total loadOpen : two independent paralleled pairs (1 + 2 and 3 + 4)Used, for example, for a dual-autopilot autoland : separate supplies for each autopilot Exam wording: two synchronising buses that can be kept isolated SSB open: two independent pairs GEN 1 GEN 2 Autopilot A GEN 3 GEN 4 Autopilot B SSB One fault can reach only one autopilot SSB closed again afterwards: all four share the load
Chapter 13 · Practical Aircraft AC Systems
19
e-books by eatpl.in · © 2026 · Do not copy or distribute
The split system breaker decides whether the aircraft has one big paralleled system or two smaller ones. With it closed, all the generators are in parallel and share the total load. With it open, the two synchronising buses are isolated from each other, and the aircraft has two independent paralleled pairs: generators one and two on the left, three and four on the right. Why would you want that? During a dual-autopilot automatic landing, each autopilot must have a completely separate power supply, so that a single electrical fault cannot disturb both at the most critical moment of the flight. Opening the split system breaker gives exactly that. Exam questions describe this as two synchronising buses which can be kept isolated, depending on the flight phase or other system requirements.
Part 4 · Parallel bus system
A generator fails in the paralleled system The failed generator's GCB opens ; its load bus stays fed through its BTB With the SSB open, its partner must carry both load buses Example: 240 kVA total, 60 kVA each; partner rises to 120 kVA (rating 90) Close the SSB : the three remaining generators share: 80 kVA eachNo loads are lost and no break occurs Gen 2 fails: 240 kVA total load 0 20 40 60 80 100 120 140 Load per generator (kVA) 90 kVA rating 60 1 60 2 60 3 60 4 normal 120 1 ✕ 2 60 3 60 4 SSB open 80 1 ✕ 2 80 3 80 4 SSB closed generator number under each bar
Chapter 13 · Practical Aircraft AC Systems
20
e-books by eatpl.in · © 2026 · Do not copy or distribute
What happens when a generator fails in a paralleled system? Its generator breaker opens, but its load bus is not lost, because the bus tie breaker stays closed and the load bus is fed from the synchronising bus. If the split system breaker is open, though, only the failed generator's partner can feed it. Take an example: four ninety K V A generators sharing two hundred and forty K V A, sixty each. If generator two fails with the split system breaker open, generator one suddenly carries one hundred and twenty K V A, well above its rating, while generators three and four are still on sixty. The answer is to close the split system breaker. Now the three remaining generators share the whole load, eighty K V A each, all within their rating, and nothing has been lost or even interrupted.
Part 4 · Parallel bus system
An earth fault on a load bus Opening only the GCB does little: the other generators still feed the fault They feed it through the sync bus and the faulty bus's BTB So the BTB opens first , protecting the healthy generators Then the GCB opens, isolating the fault completely Rule: load-bus fault = both its BTB and its GCB open GCB 2 only: no good SYNC 1 2 3 4 fault still fed via the sync bus and BTB 2 BTB 2, then GCB 2 SYNC 1 2 3 4 fault isolated; gens 1, 3, 4 carry on
Chapter 13 · Practical Aircraft AC Systems
21
e-books by eatpl.in · © 2026 · Do not copy or distribute
Failures are not always that simple. Suppose there is an earth fault on load bus two. Opening generator breaker two would do little to help, because the other three generators would go on feeding the fault through the synchronising bus and tie breaker two. That could pull down the whole system. So the protection opens the bus tie breaker associated with the faulty bus first, which stops the healthy generators being affected, and then opens the generator breaker of the generator feeding it, which isolates the fault completely. Generators one, three and four carry on, sharing the rest of the load. This is the same discrimination logic we met in the last chapter, and the exam answer is the same: a fault on a load bus needs both its B T B and its G C B to open.
Part 4 · Parallel bus system
Split bus or parallel bus? Split bus (most twins) Parallel bus (large four-engine types) Generators Isolated, never paralleled All in parallel (SSB closed) BTB normally Open Closed Extra circuits None for paralleling Synchronising, real and reactive load sharing, discrimination One generator fails BTB closes; the other generator feeds both buses GCB opens; others carry on with no break; close SSB to share Bus fault Isolate that bus; the other side unaffected Open its BTB first, then its GCB Example Typical modern twin jet Four-engine aircraft such as the 747-400
Chapter 13 · Practical Aircraft AC Systems
22
e-books by eatpl.in · © 2026 · Do not copy or distribute
Let us compare the two approaches. In the split bus system used on most twins, the generators are isolated and never paralleled, the bus tie breaker is normally open, and no paralleling circuits are needed. If one generator fails, the bus tie breaker closes and the other generator feeds both buses. In the paralleled system of a large four-engine aircraft, all the generators run together, the bus tie breakers are normally closed, and synchronising, load sharing and discrimination circuits are all needed. If a generator fails, the others simply carry on without a break, and closing the split system breaker spreads the load. A bus fault is handled differently too: in a split system the faulty side is simply isolated, while in a paralleled system the tie breaker must open first and then the generator breaker.
Part 4 · Emergency power
When everything else has gone Standby buses are fed normally, or from the battery after total generator failureThe static inverter makes AC for the essential or standby AC bus Many aircraft deploy a RAT : an emergency generator takes over the essentials Battery-only time is limited: about 30 minutes Red FAIL lights warn of no voltage on the essential or standby busesBatteries about 30 min Battery bus ESS DC Static inverter DC → 115 V 400 Hz ESS / STBY AC RAT generator or RAT hydraulics + EMER GEN takes over FAIL Red fail light: no voltage on an essential or standby bus
Chapter 13 · Practical Aircraft AC Systems
23
e-books by eatpl.in · © 2026 · Do not copy or distribute
Finally, emergency power. The standby buses are normally fed from the main electrical system, A C and D C, but after a total generator failure they are fed from the battery. The battery supplies the battery bus and the essential D C bus directly, and through the static inverter it supplies the essential or standby A C bus. Because battery time is limited, around thirty minutes, many aircraft also deploy a ram air turbine. Either it drives a generator directly, or it drives a hydraulic pump which powers an emergency generator, and that generator then takes over the essential buses so the battery is saved for the landing. On the panel, red fail lights warn the crew if there is no voltage on an essential or standby bus.
Summary
What to take into the exam Distribution Feeders from each generator run to the electrical bay under the flight deck; bus extensions reach the CB panels.
Hierarchy Main (non-essential) → essential → standby/battery → hot battery bus. Galleys shed first.
Split bus normal Each generator its own bus; BTB open; AC ESS from AC bus 1 via changeover; TRU 1 ess DC, TRU 2 non-ess DC.
One gen fails GCB opens, BTB closes automatically; one generator feeds both buses and both TRUs; shed galleys.
Both gens fail Non-essentials lost; AC ESS from static inverter; isolation relay opens; battery about 30 min.
Ground EXT PWR or APU feeds all services; never paralleled with generators; battery starts the APU.
Parallel bus GCB to load bus; BTB (closed) to sync bus; two sync buses joined by the SSB; open for autoland.
Parallel faults Gen fails: close SSB, three share. Load-bus fault: BTB first, then GCB.
Chapter 13 · Practical Aircraft AC Systems
24
e-books by eatpl.in · © 2026 · Do not copy or distribute
Here are the key points. Feeders run from each generator to the electrical bay beneath the flight deck, and bus extensions reach the circuit breaker panels. Buses form a hierarchy, from the non-essential main buses down to the hot battery bus. In the split bus system each generator feeds its own bus with the tie breaker open, the essential A C bus is fed from A C bus one through the changeover relay, and T R U one feeds essential D C while T R U two feeds non-essential D C. If one generator fails, its breaker opens and the tie breaker closes. If both fail, the non-essentials are lost, the static inverter feeds essential A C, the isolation relay opens and the battery lasts about thirty minutes. On the ground, external power or the A P U feeds everything. In a paralleled system, the split system breaker joins the two synchronising buses, and a load-bus fault opens the tie breaker first, then the generator breaker.